New: Automated Permit-Free Building Checker
September 30, 2025
Created by
Struck Team
Communication
Checking if you can build permit-free on your land just got a whole lot
easier!
Until now, using the Permit-Free Building Checker meant following a
clear step-by-step process:
• Selecting your plot on the map.
• Indicating neighbouring plots.
• Drawing the main building and outbuildings.
• Checking zoning and monument status.
This gave reliable results, and now we’ve made the experience even
smoother with a powerful new feature.
Meet the Automated Checker
With our new Automated Checker feature, you no longer have to do all
these steps manually. The system will automatically collect the necessary
information and run the checks for you.
That means:
• No more manual drawing or selecting.
• Faster results.
• Less chance of inconsistencies.
• A smooth and easy experience.
Check Multiple Plots at once
Do you want to check more than one location at the same time? No
problem! With the Automated Checker you can now:
• Enter up to 5 addresses at once.
• Or upload an SHP file to check multiple plots in one go.
This makes it perfect for professionals who work with several projects at
the same time.
Why is this important?
Whether you’re a architect, municipality worker, or contractor, time
matters. The Automated Checker saves effort, reduces inconsistencies,
and helps you move forward with your project confidently.
Try it now!
Next time you use the Permit-Free Building Checker, simply click “Try
Automated Checker” at the top. In just a few seconds, you’ll know
whether your building plans can be done permit-free, for one or even
multiple plots.